Great Lakes Minerals
New Facility; Process Framing & Equipment
Location | Wurtland, KY |
Square Footage | 37,000 |
Construction Time | 11 Months |
This is a very complex industrial facility consisting of interior platforms, shakers, bucket conveyors, to process brown fused aluminum. Facility used to receive, process, package and distribute brown fused aluminum. This building had a significant eave height of 72' to accommodate all of the bucket conveyors, silos and shaker systems required to process the material and a lower production, warehouse and shipping/distribution area. Project consisted of turnkey design build including foundations and reinforced slabs. We also had bulk storage bins with 16' tall poured concrete walls adjacent to the facility that needed to be covered, interior office areas, restrooms, locker rooms, heating, dust control and industrial electrical package.